Property InformationYaesu Daibiru Building Reconstruction PlanScheduled for completion in June 2025.
Construction scheduled for completion at the end of June 2025. Four-minutes’ walk from Tokyo Station with direct access via underground passage, at an address of 1-1-1 Kyobashi, Chuo-ku, Tokyo. The Yaesu area is currently undergoing redevelopment, and further improvements in terms of convenience and increasing footfall can be anticipated going forward, with express bus and other services being consolidated. With an imposing stone exterior which inherits the traditions and history of the former building, this is a high-grade specification building incorporating a seismic isolation structure at its midway point, CO2-free electricity use, a seven-day capacity emergency power generator, and multiple environmental certifications.
Access
4 min. on foot from JR Tokyo Sta.
4 min. on foot from Kyobashi Sta. on the Ginza Line
Emergency power generator that can operate for 168 hours
Convenience store
Retail stores
Rental conference rooms
Parking lot
Seismic vibration isolation
Property overview
Location
1-1-1, Kyobashi, Chuo-ku, Tokyo
Nearest station
4 min. on foot from JR Tokyo Sta.
5 min. on foot from Nihombashi Sta. on the Tozai Line and Ginza Line
4 min. on foot from Kyobashi Sta. on the Ginza Line
8 min. on foot from Takaracho Sta. on the Toei Asakusa Line
8 min. on foot from Tokyo Sta. on the Marunouchi Line
CASBEE Wellness Office Certification: Plan to obtain S rank certification, the highest rank
Plan to obtain “ZEB Oriented” BELS certification
Plan to obtain “Gold” LEED certification
Parking lot
52 cars (monthly and hourly rental)
Rental conference room
Available
Overview of rental rooms and facilities
Standard floor area
1,279.56 m² (387.07 tsubo)
Power receiving system
Two 6.6kV lines
Emergency power generator
In the event of a power outage, the building’s generators can supply 15 VA/m² of power (approx. 7 days)
Space for tenant generators has been secured (two 130 kVA units)
Ceiling height
2,900 mm
Raised floor
100 mm
Floor load
500 kg/m² (heavy duty zone: 1,000 kg/m²)
Outlet power supply capacity
60 VA/m²
Air-conditioning unit
Air-conditioning method: Multi-split building air conditioning system
Air-conditioning zoning: 28 zones per floor
Natural ventilation: Natural ventilation openings are installed around windows on standard floors
Expandability: Space for installation of outdoor units is available on each floor
Security
Access control using contactless IC card (24-hour operation)